Est. 1998 — London · ManchesterFramework appointed · Public sector

Building sovereign

[ 53°28′38″N 002°14′44″W ] Larkfield interchange — four slip roads, zero full closures

Infrastructure

We deliver utilities, digital networks, public estates and transport schemes for government departments, arm's-length bodies and their tier-one supply chains. Directly employed teams, transparent cost models, and a delivery record built to survive audit.

Delivery snapshot — FY25
Active sites
42
Direct workforce
1,840
Framework call-offs
27
Carbon avoided
12,400 t
Local labour on site
68%

Assessed · Accredited · Insured

  • ISO 9001 Quality
  • ISO 14001 Environment
  • ISO 45001 Safety
  • ISO 27001 Information
  • Cyber Essentials Plus
  • Constructionline Gold
  • CHAS Elite
  • Achilles UVDB Verify
  • Common Assessment Standard
Selected programmesUK-wide delivery

Evidence,
not adjectives.

Four recent schemes, all publicly funded, all delivered with the data published below. Client names are withheld where commercial confidentiality applies.

Full programme record
Transport53°28′38″N 002°14′44″W2022 — 2024£48.0m

Larkfield Interchange Renewal

Strategic road authority

Full deck replacement and re-jointing across four slip roads, sequenced through 47 weekend possessions with no full carriageway closure. Off-site manufactured deck units took nine weeks out of the programme.

Apprenticeships
42
Local labour
68%
Carbon avoided
3,100 t
Read the case study
Public buildings53°48′12″N 001°32′41″W2023 — 2025£22.4m

Northgate Acute Wing M&E

Acute NHS trust

Replacement of clinical ventilation, medical gas and theatre engineering services across a live acute wing. Fourteen decant moves sequenced around elective lists, with clinical commissioning signed off wing by wing.

Clinical downtime
Zero
Decant moves
14
Energy reduction
31%
Read the case study
Utilities52°57′19″N 001°09′02″W2024 — 2025£16.8m

Trent Valley Trunk Main

Water undertaker, AMP8

4.2 km of strategic trunk main rehabilitated by trenchless lining through a floodplain site of special scientific interest, including eleven crossings of rail and river infrastructure in shared possessions.

Trenchless length
4.2 km
Supply interruptions
Zero
Habitat reinstated
9.4 ha
Read the case study
Digital52°28′48″N 001°54′09″W2024 — 2025£9.6m

Eastern Fibre Spine

Combined authority

186 km of new duct and 1,900 km of fibre connecting 214 public sites — schools, libraries, GP surgeries and council offices — onto a single managed telemetry and monitoring platform.

Public sites connected
214
Duct built
186 km
Programme variance
−3 wks
Read the case study
Delivery modelHow we are procured

From market
engagement to defects.

One accountable project director from award to final account. No re-tendering, no novation, no change of faces at the point the risk lands.

01

Pre-market engagement

Early contractor involvement before the ITT lands: buildability review, risk allocation, and a programme costed against real supply-chain capacity rather than optimism.

02

Framework call-off

Direct award or mini-competition through the frameworks we hold, with a priced tender return inside ten working days and no novation of your programme.

03

Mobilise and deliver

Directly employed supervisors, weekly cost-to-complete reporting, and a single accountable project director from award to handover.

04

Handover and aftercare

Commissioning evidence, as-built information and a 24-month defects period managed by the same team that built the asset.

Social value & assurancePPN 06/20 aligned

Procurement-ready.
Audit-ready.

Social value is priced, contracted and reported — not appended to the bid at the eleventh hour. Every commitment below is measured against a baseline agreed with the contracting authority before mobilisation.

Accreditations & frameworks
£1.4bn
Delivered since 1998
312
Public sector schemes
1,840
Directly employed
68%
Local labour on site
12,400 t
Carbon avoided FY25
£18.6m
Social value committed
ISO 9001 Quality
ISO 14001 Environment
ISO 45001 Safety
ISO 27001 Information
Cyber Essentials Plus
Constructionline Gold
CHAS Elite
Achilles UVDB Verify
Common Assessment Standard
Next stepProcurement gateway

Bring us in at the
pre-market stage.

Tell us the scheme, the framework and the programme dates. A director responds to every enquiry within two working days, with a named point of contact for the bid.